Many consumers believe that it is a great sense of accomplishment to personally design their own home and make it personalized. But almost every renovated home will have some regrets, or poorly thought out design, or renovation of negligence and left "sequela". Especially the bathroom, do not underestimate the inconspicuous place. If without a complete design, the decoration will be messed up.

This bathroom, where function is paramount and plumbing and electricity are all available, is one of the more difficult in the home. Decoration design, sanitary ware selection or construction quality, which can not be ambiguous. Whether it is a renovation company or consumers, as long as a little inattention will leave a "dead end", adding to the future use of trouble. The "dead ends" mentioned here, including the following three aspects.
1. Before purchasing you did not consider the installation, after purchasing you found that it was neither beautiful nor convenient to use.
According to reports, in recent years consumers are more and more willing to spend money on bathroom decoration, and in addition to construction, the follow-up investment funds are also very large, usually only the purchase of bathroom sanitary ware costs about 1/8 of the total amount of renovation. Due to a wide variety of bathroom products, prices vary greatly from ten of dollars to more than 10,000 dollars. Consumers go to the home improvement market to buy what they need, but only to find with their own bathroom is not coordinated.
Experts remind: It is best for consumers to consider exactly what products to buy in the design phase, in accordance with the specific installation requirements and technical parameters of the products purchased to reserve space, transformation pipeline, to create installation conditions to ensure that the renovation process can be successfully completed, bathroom products can be installed and used normally.
2. Due to poor consideration before the start of construction, the construction was modified while the plumbing and electrical circuit transformation was not charted, leaving hidden problems for subsequent construction.
In general, the decoration company will draw out the design for the owner, which includes the overall effect, detailed construction drawings and plumbing and electrical circuit transformation drawings. However, because some owners do not communicate with the designer sufficiently in advance and do not consider it well. As construction proceeds, modifications are made to the original design, and modifications are made while construction is underway, and hidden works such as plumbing and electrical reconstruction are completed but found to be unavailable, leaving hidden dangers for subsequent construction.
Bathroom with plumbing and electrical circuits need to be modified, consumers should ask the designer for a circuit modification map in advance. If there are changes in the construction process, consumers must also communicate with the designer and redraw a transformation plan, and then start construction. It is best not to modify while constructing, so as not to cause future disasters by injuring the wires when working on the wall.
3. The design is not flexible, and a slight error in construction will cause a series of rework.
This situation is more common in the bathroom. Such as the wall socket is fixed, only to find that the height of the ceiling clashes with it, but at this time the wall has been tiled, it is difficult to change.
Consumers in the purchase of bathroom products must be considered before the existing design scheme and the future construction is feasible and flexible. Such as faucets need to be pre-buried suitable water piping, bathroom cabinets require sufficient space reserved for installation, toilets need to consider the wall distance, shower rooms need to consider the load-bearing walls, floor drain location to be appropriate, etc. These conditions must be done in the process of home construction, otherwise bathroom products can not be installed and used.